My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. PCSR 08-09-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
08-09-2011
>
5.4. PCSR 08-09-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2011 11:50:08 AM
Creation date
8/5/2011 11:44:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />:~?$'~~~ <br />(1~ 1~~..ining activities shaIl uat cause excessive vibration off site. 7£ <br />excessive vibration. becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br />(IS) Czrour~dwatex protection measures shall include: <br />a. The operator shall file with the Gity an emergency spill _ <br />xesgonse plan. The operator shall adhere to this plan in <br />the event there is a spilt. _, <br />b_ The Operator shall provide the Fixe Departanent with a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shal.~ be above ground, properly diked (if <br />required by Iaw}, and registered with 11~1PG9.. <br />d. All incidences that have the potential to adversely affect <br />groundwater, includinb but not limited to spills, shall be <br />vexbalty xeported tQ the City within 24 hours. This verbal <br />notification shall be followed up ixa writing within ~ <br />worl~ag days. <br />e. Czzavel wash operations shall be prohibited on the <br />progeny. <br />fl Mining operations shall be conducted a ~in;mtsm Of five <br />(b) feet above the seasonally high water table_ <br />g. The appropriate storm ~srat~r permit shall be obtained by <br />the op erator from MP C A. <br />{19) Fen_c_zng -The entire perimeter of the properly shall. be fenced. <br />(20) Sereenina and Buffering - lvo mining operations shall be <br />conducted within two hundred (200} feet of the property boundaxy. <br />Further, within this two hundred (200) foot buffer area trees shalt be <br />left fox scxeening. In open areas where trees do not east, screening <br />shall be accomplished by the construction of a m~n~~+um six {6) foot <br />high berm planted with evergreens. <br />~.} General Provisio~- <br />(Q1) Per~,at~- Operator agrees to comply ~cvith all of the provisions - <br />hereof and agrees to save anal hold the City harmless from any and all <br />~uPsr-~a~~n <br />
The URL can be used to link to this page
Your browser does not support the video tag.