My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 08-08-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
08-08-2011
>
5.2. SR 08-08-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2011 9:51:07 AM
Creation date
8/5/2011 9:47:11 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/8/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(see Figure 9-1). These items outside the study area are not anticipated to impact <br />the study area. <br />Land Use Compatibility <br />The City updated their Comprehensive Plan in August of 2004. The Comprehensive <br />Plan includes a "Land Use Plan" which provides the framework for the growth and <br />development of Elk River. The Land Use Plan serves as a guide for the character and <br />intensity of development throughout the city, including the study area. <br />All of the land within the study area is undeveloped. This area is currently being <br />used as agricultural land, and has been established for many years and is generally <br />compatible with the surrounding land uses. <br />Immediately north of the AUAR study area are a number of existing light industrial <br />' developments. The Comprehensive Plan guides this area to remain light industrial <br />through the year 2030. Just north of the study area is the Northstar Commuter Rail <br />Station that is guided to remain in public/semi-public land use. These land uses <br />' should be compatible with development that occurs in the AUAR study area and vice <br />versa since they are all urban land uses of a similar nature. <br />' East of the AUAR study area across the Burlington Northern Railroad track the land <br />use pattern is agricultural. The Elk River Comprehensive Plan guides this area to <br />remain agricultural (agricultural research). These areas may experience some <br />impacts from light and traffic noise from the AUAR study area. Scenario 1 identifies <br />the area along the east portion of the study area as agricultural research which <br />would likely create fewer negative impacts for surrounding land owners. Scenarios <br />' 2 and 3 guide the eastern portion of the study area as job areas, which may develop <br />in a similar manner as existing light industrial and commercial land uses further to <br />' the south, to the north and to the west of the AUAR study area. Although this land <br />use is different than existing conditions, as well as those agricultural areas to the <br />west, these land uses proposed in the development scenarios could provide lobs and <br />services to those residents living nearby. <br />South of the AUAR study area the land use pattern is largely agricultural. However, <br />this area is guided for highway business and light industrial land uses by the City's <br />Comprehensive Plan. This development will likely be similar to existing <br />development that occurs north of the study area, as well as those land use scenarios <br />' developed in this AUAR. <br />West of the study area the land use pattern is currently made up of existing <br />' commercial developments, as well as agricultural and rural residential land uses. <br />Open space along the Mississippi River corridor currently existing with steep slopes <br />and vegetative areas running parallel to the river. These existing land uses are <br />' consistent with scenarios reviewed in the AUAR and should not present any <br />compatibility issues or environmental conflicts with appropriate site design. <br />City of Elk River <br />Draft Alternative Urban Areawide Review <br />July 2011 Page 25 of 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.