My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION 08-01-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
08-01-2011
>
INFORMATION 08-01-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2011 10:13:25 AM
Creation date
7/29/2011 10:13:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Netivslet <br />PROJECT AREA 2 INFORMATION <br />At the start of construction, the east portion of the project will be milled. The streets will be signed as closed to all thru <br />traffic but access to your property will be maintained. Normal working hours expected on this project are from 7:00 a.m. <br />to 7:00 p.m., Monday through Friday and possibly Saturdays. <br />The construction involves the placement of a new storm sewer system to serve the new surface improvements. Once the <br />new storm sewer is installed, the grade of the streets can be re-established and the contractor will be moving into the <br />curb and gutter installations. After the concrete curb and gutter has had sufficient time to cure, driveways will be placed. <br />Following the completion of the concrete work, the bituminous pavement will be completed. Landscaping will then follow <br />with the installation of sod to reestablish the disturbed boulevards. Construction is expected to be completed by early <br />October. We will work with the businesses to minimize and coordinate access disruptions during the construction. <br />PRIVATE IRRIGATION SYSTEMS. INGROUND DOG FENCING <br />The construction work involves much excavation within the road right of way. If you have an irrigation or buried dog <br />fencing system in place, please locate the lines and sprinkler heads along the road. Contact the Project Inspector and let <br />him know when and where they are located. If your system appears to be in the way of construction, the inspector will <br />notify you and ask that you remove the heads and shut down the zone in your system that is affected. <br />SAFETY ,wP <br />We urge you to use caution around the work site. Your assistance in reminding area children to stay ~;`"~ <br />clear of construction equipment is helpful in maintaining a safe environment. Your patience and ~ v`.,' ~., <br />cooperation during,.this construction will be appreciated. Please let your children know the survey ~ ~ r, rj ~~r~' +,~ <br />stakes represent valuable information and should not be disturbed.>Help us work efficiently, If v/e need ~ ~ i'' ~; i' <br />to re-stake because the survey stakes are removed, it just takes that much longer to complete our , , ; ~ ~ ~ ~ ,~ <br />work: If you observe any acts of vandalism or safety hazards after hours, we urge you to contact the ~ ~ i ij ~ ' ~, <br />Police Department or any of the contacts listed on thisnewsletter. ~~ ~- ~+ i <br />PROJECT MAP <br />Thank you for your corporation <br />during this construction <br />project. If you have any <br />questions or concerns during <br />the project, please call any of <br />the contacts listed on the front <br />side of this newsletter. Cody, <br />the project inspector, will be <br />on site at all times during <br />construction. He will be your <br />fastest link to solve any <br />problems you are experiencing <br />during construction. <br />__ _ ._ <br />BQL-T~vON ~„K (CITY ~F E~ '.`~. ..'A <br />...~...~._.~..~~.~.°~1~~~ ~~ ~ ~ r <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.