My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8. ICESR 07-26-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2011
>
08-03-2011 - SPECIAL
>
8. ICESR 07-26-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 2:27:00 PM
Creation date
7/28/2011 2:27:00 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
7/26/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
would basically be a fee to be able to leave your equipment in the locker rooms and keep <br />aired out. <br />• Elk River Figure Skating Club -Commitment of $5000 per year for 20 years. This type of <br />commitment would total about $100,000 to the project with about $100-125 per player in <br />the club. <br />The expanded lobby, additional meeting rooms, JV/Varsity locker rooms, dry land training, equipment <br />room, as well as the needed capital improvements items such as new roof on the barn, change out of <br />the refrigerant and ice systems would go a long way in helping all the groups expand their programs <br />with the additional space and improved facility. <br />This project started as the City Council and Ice Arena Commission started to put a long range budget <br />together of the Capital Improvements that will be needed at the Ice Arena over the next 5 years or so. <br />Some of the items that were on the list included: <br />• Roof replacement <br />• New refrigerant <br />• Expanded area for the maintenance, use and operation of the Zambonis. <br />• Expand lobby <br />• Varsity locker rooms <br />The present mortgage of about $200,000 per year on the existing building will be paid off in 2013. The <br />City of Elk River has responsibly and generously expended over $1 million to cover Capital outlays and <br />eliminate deficits over the past 10 years. <br />Reason for commitment: <br />• Support from the Elk River City Council up to this point for the conceptual drawings by 292 <br />Design Group. <br />• We need your Associations support both marketing and financial for this project to proceed <br />• You might think this is not a good time to do this type of project. But I think people will always <br />say this is not a good time to do a project of this magnitude. But we feel this might be the right <br />time as we go through the process with support of the Ice Arena Commission and Elk River city <br />Council up to this point. But, if we are going to hope to get additional support from the Ice <br />Arena commission and City Council we will have to show support and a type of partnership with <br />each of the major user groups in helping to finance this project. Most other associations are <br />partnering with their respective cities to help fund the expansion or continued improvements of <br />the facilities they are big users of. In most cases it could be considered basically a user fee for <br />rental spaces of equipment rooms, dry land training facilities, meeting rooms for use, improved <br />locker rooms, Varsity/JV Locker rooms, expanded lobby areas to be able to hold additional <br />tournaments or shows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.