My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-05-2005 ICE MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Minutes
>
2000-2009
>
2005
>
04-05-2005 ICE MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2011 10:27:30 AM
Creation date
7/21/2011 10:25:08 AM
Metadata
Fields
Template:
City Government
type
ICEMIN
date
4/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ice Arena Commission Minutes <br />April 5, ?005 <br />Page G <br />11. Staff Updates <br />A. Shooting Area <br />Arena Manager Rich Czech stated that the shooting area that vas completed last fall was <br />very popular throughout the season. He stated that no fee was charged and the plan is to not <br />charge a fee again this year. ML. Czech noted that the shooting area was reserved by teams <br />and the supervision was good. <br />MOVED BY COMMISSIONER HALGREN AND SECONDED BY <br />COMMISSIONER JOHNSON TO RESCIND THE MOTION MADE AT THE <br />AUGUST 3, 2004, ICE ARENA COMMISSION MEETING STATING THAT <br />FEES WOULD BE CHARGED FOR USE OF THE ARENA SHOOTING AREA. <br />MOTION CARRIED 7-0. <br />MOVED BY COMMISSIONER HALGREN AND SECONDED BY <br />COMMISSIONER JOHNSON TO RECOMMEND THAT THERE BE NO <br />CHARGE FOR THE ICE ARENA SHOOTING AREA. MOTION CARRIED 7-0. <br />B. Summer Proiects <br />Arena Manager Rich Czech stated that this year the Arena added a water softener that <br />provides soft water throughout the building. ML. Czech indicated that the water softener has <br />already made a big difference in the condition of the ice as the ice sets up faster and has a <br />clarity it has never had before. Mi. Czech also noted that the scale that once built up on the <br />equipment is no longer there, resulting ui a newer looping Zamboni. Mr. Czech also <br />indicated that this summer the cooling towers chemical treatment plan will be reviewed to <br />see if the amount of chemicals can be cut down on. He noted that using cooler water to <br />resurface the ice will also be looked at which would cut down on the gas and electric bills. <br />Mi. Czech stated that besides the usual cleaning, Arena staff will be painting, installing <br />rubber matting, installing outlets, and putting up a couple sections of center groove in the <br />Barn during the sulnlner. <br />C. D>-yfloor <br />Mr. Czech reviewed the diyfloor schedule for the summer months. <br />12. Other Business <br />There was no other business. <br />13. Adjournment <br />There being no further business, MOVED BY COMMISSIONER HALGREN AND <br />SECONDED BY COMMISSIONER POLSTON-HORK TO ADJOURN THE <br />MEETING OF THE ELK RIVER ICE ARENA COMMISSION. THE MOTION <br />CARRIED 7-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.