My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 07-18-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
07-18-2011
>
5.1. SR 07-18-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2011 9:59:16 AM
Creation date
7/15/2011 10:10:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
previous projects all town home or twin home properties are proposed to be assessed at $5,238.46 or 0.75 <br />residential equivalents per dwelling unit. The properties along the 15L Street cul-de-sac are proposed to be <br />assessed at a rate of $1,746.15 or 0.25 residential equivalents per dwelling unit. Commercial and industrial <br />properties have been assessed at a rate of $10,476.92 or 1.5 residential equivalents. <br />Assessments in Project Area 2 have been calculated with the total assessable costs split throughout the <br />Industrial Park based on 50% per unit and 50% on assessable lot frontage. Assessments in Project Area 2 <br />range from $6,256.83 to $18,852.37. <br />At the close of the assessment hearing, it would be appropriate for the City Council to consider the <br />attached resolutions. The first resolution adopts the final assessment roll (which is also attached). This <br />can be adopted with any revisions to the assessment roll that the City Council deems appropriate after <br />listening to testimony from the public. A final notice of the assessment schedule including interest rate <br />will be mailed to each property after the assessment hearing, indicating the action the Council has taken. <br />The second resolution awards the contract. This resolution has been prepared based on staff <br />recommendation to not include the sidewalk along Evans Avenue. It would only be appropriate to <br />consider this second resolution if the resolution adopting the final assessment roll is passed by the City <br />Council. <br />FINANCIAL IMPACT <br />Based on the low bid received, the total project cost including overhead is estimated at $1,655,976.72. <br />The total cost of private property assessments, as detailed in the attached assessment rolls, is $560,615.41. <br />The remaining project cost is proposed to be funded by the appropriate City and Elk River Municipal <br />Utility funds. <br />ATTACHMENTS <br />^ Tabulation of bids <br />Resolution adopting final assessment roll <br />^ Assessment Roll -Project Area 1 & Project Area 2 <br />Resolution awarding the low bid and authorizing execution of the contract <br />Action Motion by Second by Vote <br />Follow Up <br />N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\07-18-2011\Assessment and Bid.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.