Laserfiche WebLink
FROM: <br /> <br /> TO: <br /> <br /> PARTIAl PAYMENT ESllMATE <br /> <br /> NO. 1 <br /> <br />SEPTEMBER 15, 1997 <br /> <br />OCTOSER 6, 1997 <br /> <br />CONTRACTOR: <br />ADDRESS: <br />OWNER: <br />PROJECT: <br /> <br />COLLISYS, INC. <br />4990 NORTH HIGHWAY 69, NEVV HOPE, MN 55428 <br />CITY OF ELK RIVER <br /> <br />TH 169 FENCING AND LIGHTING (230347M) <br /> <br />COMPLETION DATE AMOUNT OF CONTRACT: <br /> <br /> ORIGINAL: MAY 30, 1998 ORIGINAL: $ 362,209.75 <br /> REVISED: REVISED: <br /> <br /> I 2021.5 MOBILIZATION LS 1 7,500.00 0.50 3,750.00 0.50 3,750.00 <br /> <br />2 2101.5 CLEARING AND GRUBBING LS 1 15,700.00 0.50 7,850.00 0.50 7,850.00 <br />3 2545.5 LIGHTING UNIT TYPE 9-40 EA 62 1,221.00 0.00 0.00 0.00 0.00 <br />4 2545.5 LIGHT BASE DESIGN E EA 62 350.00 0.00 0.00 0.00 0.00 <br />5 2545.5 3" RIGID STEEL CONDUIT LF 920 19.90 1,415.00 28,158.50 1,415.00 28,158.50 <br />6 2545.5 1.5" NON-METALLIC CONDUIT LF 16080 2.65 15,175.00 40,213.75 15,175.00 40,213.75 <br />7 2545.5 UNDERGROUND WIRE 3 CONDUCTOR NO 4 LF 16350 2.45 0.00 0.00 0.00 0.00 <br />8 2545.5 SERVICE CABINET SECONDARY TYPE L1 EA 5 2,101.00 0.00 0.00 0.00 0.00 <br />9 2545.5 EQUIPMENT PAD B EA 5 350.00 0.00 0.00 0.00 0.00 <br />10 2557.5 WIRE FENCF~ DESIGN 72-9322 LF 14539 6.80 7,250.00 49,300.00 7,250.00 49,300.00 <br />11 2557.5 METAL BRACE ASSEMBLY (CHAIN LINK FENCE) EA 1453 5.85 40.00 234.00 40.00 234.00 <br />12 2557.5 ELECTRICAL GROUND EA 11 55.00 0.00 0.00 0.00 0.00 <br />13 563.60 TRAFFIC CONTROL LS 1 6,500.00 0.50 3,250.00 0.50 3,250.00 <br />14 564.60 ZEBRA CROSSVVALK-WHITE POLY PREFORMED SF 1350 10.30 0.00 0.00 0.00 0.00 <br /> <br />T TOTAL BID 132,756.25 132,756.25 <br /> <br />TOTAL AMOUNT THIS PERIOD <br />TOTAL AMOUNT TO DATE <br /> <br /> DESCRIPTION <br /> TOTAL BID <br /> <br />132,756.25 <br /> <br />TOTAL THIS PERIOD TOTAL TO DATE <br /> 132,756.25 132,756.25 <br /> <br />AMOUNT EARNED $132,756.25 $132,756.25 <br />AMOUNT RETAINED $6,637.81 $6,637.81 <br />MATERIAL ON SITE $0.00 $0.00 <br />MATERIAL DEDUCT. $0.00 $0.00 <br />PRE~/IOUS PA~ENTB ......................................................... $121.00 <br />NVlOUNT DUE $126,118.44 $126,118.44 <br /> <br />132,756.25 <br /> <br />n:~clericalL?30547# l PAGE I <br /> <br /> <br />