Laserfiche WebLink
2) Seing the pond is intended to be dry, the outlets into the ponding areas shah be <br />extended and installed to an elevation ~, above the bottom. <br />Cutlets into the pondfng areas shelf be extended and <br />installed to an elevation ' af~o~=e tfze bottom. <br />3) Please include existing and proposed drainage reports for the 2 and 1 G year rain <br />events. <br />existing and proposed drafnage reports for the 2 .and 'f 0 year <br />rain e~rents will be submitted. <br />'~ccessl oarkino <br />3} The currently proposed access off of Jackson, fivenue is temporary. When the <br />property to the south along Jackson is developed, access off of .Jackson ~~ill ~e :shared <br />as it aligns v4;ith 8`h street. Please adjust the plans to illustrate the future alignment. <br />unman Architects and Builders wi[l provide a revised plan for the City <br />Council Meeting by July 13{". <br />4} The parking lot appears to be less than 10 feet from the property line, 'in particular the <br />property lines shared with the apartment building NE of the church building. In fact, it <br />appears that a portion of the proposed parking extended ovAr the property line shared <br />with the .apartment building. Please adjust.. <br />The part{ing spaces located adjacent to the apartment building lti f~ of the <br />church building are existing spaces to remain -and are currently -net part of <br />the projecf. <br />Landsca~inctNeaetation <br />5) Sheet3 shows a landscaped jsland in the main part of the parking lot, on t:he vaest <br />side of the drive from School street; a storm sewer ifne runs through this island. A tree is <br />proposed to be planted here, which is likely to cause conflicts. <br />The tree wi:El be relocated on the revised site plan, <br />The number oftrees is consistent witi~ the requirements of Section 30-93~ (b)(3}. <br />6) Please either relocate car provide street trees aiflng School Street. <br />VanEnan Architects and Builders will pr~uide a revised plan relocating trees <br />on the site'to provide street-tress along School Street. <br />7) Please provide additional shrubbery along School Street and Jackson avenue for <br />headlight screening.. <br />Vanman Archi#ects and Builders will provide a revised plan providing <br />additional shrubbery along School Street and Jackson Avenue far <br />headlight screening. <br />.t=ire Chief <br />8) Please provide a fire hydrant at the new front of .the building, the -south east entrance. <br />This hydrant supply shall came off of Jackson Ave .because of placement of the west fire <br />lane and the water supply to that Pane. <br />A new fire hydrant shell be located near the south east entrance of the <br />building. Due to budget concerns, the church would prefer to core-nett to <br />the water service off of School Street instead of Jackson Avenue. <br />Page 3 of 5 <br />