~..-~ This wetland receiving discharge from the site currently has two existing channel outlets, both of <br />which eventually drain into Rice Lake. The north channel outlet, currently located on property <br />owned by ERL will be utilized as the outlet channel for the southwest storm water pond. The <br />channel outlet will be re-excavated to match the elevation of the more southerly outlet to ensure <br />that flows through the south outlet onto the adjoining property are not significantly increased <br />from the existing condition. <br />Routine maintenance of the drainage control structures are initiated in response to general <br />inspections or inspections prompted by a heavy rain. The sedimentation ponds will be cleaned <br />periodically to maintain their optimum settling capacity. <br />The location of the easement for the proposed stormwater discharge piping located under the <br />City Trail is illustrated on the Drainage Plan Drawing (Sheet 4). <br />The exact location and configuration of the downslope structures and conveyance piping <br />discussed above may be revised in the future, but will be in general conformance with the <br />stormwater routing and management system presented in this application. <br />1.2.5 LANDFILL CLOSURE CONSTRUCTION <br />Final grading and closure of the landfill will be in accordance with the drawings included as ~~Final <br />Cover Grading Plan" (Sheet 2). The grades of each closure phase will provide a uniform surface <br />with adjacent phases to facilitate surface water drainage. Each closure construction phase, as <br />well as the final closure of the landfill, will be done in accordance with approved plans and <br />regulations. Upon completion of final closure of the expanded Landfill, County will record a deed <br />notation for the property indicating what the property had been used for and pertinent details. <br />The expanded Landfill will be closed in a series of phased construction projects. The anticipated <br />closure sequence and timing for the expanded Landfill is shown in the following Table 2. The <br />timing of closure construction will be dictated in part by incoming waste volumes, as well as site <br />operations to maximize gas production. Closure of the landfill includes the engineered cover <br />system, gas collection components, and the surface water controls as approved in permit <br />documents. <br />Table 2. Anticipated Closure Sequence and Timing <br />Cell Number Approximate <br />Year of Closure Approximate <br />Acres Closed <br />18 2015/2016 8.35 <br />19 2017/2018 7.64 <br />20 2022-2030 31.5 <br />City, as well as MPCA and County, will be notified of impending phased closure at the expanded <br />Landfill prior to initiation of closure construction. The ERL will make any updates to the closure <br />sequence as part of the facility's annual report. <br />1.2.6 LANDFILL END USE <br />The current end use plan for the Landfill applies to the expanded Landfill. The end use plan <br />provides for open green space. Long term, the open space planned for the site would be <br />compatible with any adjacent future use. The final end use determined for the site will be <br />~;, consistent with the terms of the May 25, 2011 Agreement. <br />Elk River Landfill SDA Section 1-5 <br />Land Use Application ~V21~CI< <br />ELR FIVL.x LLncFlCt <br />