Laserfiche WebLink
~. Buildingplans. Generally-, the more developed building plans are, the better <br />informed the public, cite- staff, and the Cit-~- Council can be during the review. I note <br />that the building floor plans are sketches, and are not issuable for building pe~--mits. <br />Final dra~cings drawn b~ an architect w711 be necessary to ~-erifr occupancy-, load, <br />exiting, and oilier factors, prior to issuance of a building permit. <br />6. Drainage Calculations. The CitC- Engineer has determined that drainage calculations <br />are not required at this time. <br />I hope this information is helpful; please do not hesitate to contact me if you ha, e an,~ questions. <br />I can be reached at 63/635-1034 <br />Sincerely, <br />Jeremy Barnhart <br />Plai~rung Manager <br />Phone: 7b3.635.1000 <br />Fax: 763.635.1090 <br />www.ci.el k-river.mn. us <br />