My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 07-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
07-12-2011
>
5.1. PCSR 07-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 10:07:34 AM
Creation date
7/8/2011 10:06:00 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project I~?arrative <br />The building grill be a Buddhist meditation center. <br />The hours of operation will be M thru F 10:00 am until 1:04 pm <br />Sat'& Sun 10:00 am unti12:00 pm. There u~ill be an average of ~ to 10 members <br />attending sen~ice at any given time and 2 or 3 employees in attendance also... <br />There are 4 existing parking stalls and 30 more proposed, a surveyand site plan has..been <br />done: The building will corriply with all applicable building codes.. The exterior will <br />be matched to the existing;vinyl siding and the roof will be of asphalt shingles. There.. <br />will be l sign only at the entrance of the driveway made of wood, 1'x3' . There will be <br />1 storage shed made of wood 10`x14' at the back or I~TOrth side of: he property that will <br />contain a Lawn mower,gardening tools, snow shoveling equipment, and some folding <br />tables and chairs. The center. is for quiet`healing mediation and tranquility and is <br />designed to stay as close to natural nature. as ;possible. <br />Sincerely:. <br />- Thai Buddhist Center of Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.