My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 07-11-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
07-11-2011
>
5.7. SR 07-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 3:28:10 PM
Creation date
7/8/2011 9:11:16 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment Services -The overall equipment services budget remains consistent with prior <br />years. Operating supplies increased and equipment parts decreased due to reclassification of <br />the car and truck computer updates from equipment parts to operating supplies. <br />Engineering -The engineering budget is consistent with last year. The personal service <br />does still include the Engineering Tech I position to be filled. Justin has evaluated the type <br />of work needed and would like to discuss changing the currently unfilled Engineering Tech I <br />position to an Engineering Tech II. Operating supplies decreased and equipment <br />repair/maint services increased due to proper classification of the annual service agreements <br />for engineering. <br />Surface Water Management Fund (requested <br />The Surface Water Management is a capital project fund separate from the General Fund. It <br />does have a tax levy allocation. There has been an increasing need to spend more time and <br />efforts in the storm water area due to federal mandates with the City's NPDES permit. Due <br />to anticipated increased maintenance costs associated with storm water infrastructure, the <br />budget is anticipated to increase. As you can see by the cash flow spreadsheet attached we <br />will need to address the long term funding of storm water management. Several cities have <br />implemented a NPDES fee to cover the increased maintenance costs or increased the tax <br />allocation. We will be doing additional research over the next year to make a <br />recommendation on how this will be funded long-term. <br />Fire Department ~equestedl: <br />Fire Administration -Personal services (part-time) pay is based on 395 fire calls and the <br />Duty officer program. We have included on the vacant/requested positions sheet the <br />impacts if 450 calls are reached and Chief Cunningham would like to discuss a technical <br />rescue team stipend. Operating supplies are increasing due to the replacement of pagers and <br />firefighting gear. Travel, Conferences & Schools decreased due to grants for firefighter <br />training. Equipment Repair & Maintenance line item is increasing for apparatus pump <br />maintenance and EVT service and safety. <br />Fire Inspections - No significant changes in this budget from 2011. <br />Emergency Management -This budget has the capital outlay expense to continue radio <br />board upgrades to meet FCC narrow banding mandate. This has been allocated over two <br />years and 2012 will be the final budgeted expense for the project. <br />Next Stens <br />We will continue budget discussions on July 18 with the Community Development and <br />Police budgets. <br />Attachments• <br />• 2012 Capital Outlay breakout -requested <br />• 2012 Position requests/unfilled spreadsheet <br />C:\Users\jmiller\AppData\Local\Microsoft\Windows\Temporary Internet <br />Files\Low\Content.IES\lAFUW23B\budgetmemo0711 [1].docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.