Laserfiche WebLink
10) Finally, please clarify "Sermon Series Signage". I understand this are to be <br />changeable copy; if its electronic changeable copy, :please .provide a .note on the plans. <br />The Crossing Church wit{ continue to post "Berman Series Sgnage" <br />similar to what tfiey :post currently on the corner of`School Street and <br />Jackson Ave. The signage wild not be electronic and will change every <br />four weeks to a new sign describing the new "Berman Series". 1n the <br />future, the church may desire to have electronic signage, but we are <br />currently not proposing to do that at this time. <br />Building design <br />11} 1 reviewed the building. height. Although porEions of the .building -wall exceed 4t? feet <br />high, based on the defiiniton of height, the building height is perm:"sssible. <br />12) Please verify that all mechanical units,. ifi mounted on the roof, will be screened from. <br />public view, including the streets and Lions Park. <br />All mechanical units wit( be screened from ;public view. <br />13} The permissible amount of lot coverage is 25°l0. Because the language of the <br />ordinance is unclear, we have interpretedthat lot coverage calculation is applied to the <br />'building only, not the parking lot.. This is consistent-with the application in the past, and <br />:amount to a lot coverage area vfi approximately 14°1°. <br />14) Please provide color and material samples for review by the Planning Comrriission <br />and City Council. <br />Vanman Arcftitects and Builders will provide photo copies of materials for <br />review by the Planning commission and City Council. <br />Revised plans will be sent by July 1`3~' for distribution in the City Council Packet fior the <br />July 18th meeting.. Please let me know if there are any other questions. <br />Sincerely, <br />Ang Knodel, AlA <br />Vanman Architects anti Builders <br />Page 5 of 5 <br />