My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 07-11-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
07-11-2011
>
5.3. SR 07-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 8:32:34 AM
Creation date
7/8/2011 8:32:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # 5.3. <br />.--i ~/ <br />•••,_•-: <br />Elk <br />River <br />MEMORANDUM <br />TO: Mayor and City Council <br />FROM: Tim Simon, on Behalf of the PW Committee <br />DATE: July I I, 201 I <br />SUBJECT: Public Works Facility Update <br />The Public Works Committee has been working over the past several months with the 292 <br />Design Group on the design of the renovation/expansion of the current maintenance <br />facility. At tonight's meeting, Pam Anderson, 292 Design Group will provide an update on <br />the site layout and the latest design of the facility. In addition, Brian Recker from RJM <br />construction will update the Council on the budget for phase I and phase II of the project. <br />Brian will also provide some insights on the current bidding environment. As we move <br />from schematic design to development design the budget will be more accurately updated. <br />We have previously discussed the idea of completing phase I this fall with the funds that <br />were designated from the liquor store. Phase I would include mainly items such as the fuel <br />island, site layout, and moving the salt storage building. There are sufficient funds available <br />for phase I based on the size and scope of the work. In order to complete phase I this fall, <br />bids would need to be authorized on July 18 and a conditional use permit would be started <br />for council consideration in August. Once phase I bids are received, a resolution <br />transferring the funds from the liquor store to the government building fund will be <br />completed. After the final design is completed over the next several months, a complete <br />financing package and budget will be presented for Council to consider before phase II is <br />authorized. <br />Attachments• <br />2011-2015 -Capital Improvement Plan sheet for the maintenance facility <br />N:\Public Bodies\City Council\Coundl RCA\Agenda Packet\07-11-2011\maintenancefacilityupdate[1].docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.