My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION 07-05-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
07-05-2011
>
INFORMATION 07-05-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2011 8:42:16 AM
Creation date
7/1/2011 8:42:16 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 2, 2011 <br />Page 5 <br />Savings Related to Reducing Delay <br />This calculation is related to the total amount of delay for the roadway network associated with this <br />intersection. Currently there is an existing pm peak hour intersection delay of 203 hours, which <br />would be reduced to three hours after the proposed interchange is constructed. This will result in a <br />total time savings of 200 hours. There are many different ways to calculate the value of time delay <br />with the most common method incorporating a dollar per hour per person for their time which <br />includes operation and maintenance of the vehicle. This is calculated to be $13.80 per hour per <br />person, or using the 1.35 occupancy rate, arriving at an $18.63 value per vehicle. The $13.80 value <br />was provided from the U.S. DOT Guidance of Travel Time in Economic Analysis, 2003. The <br />annual delay savings as calculated below amounts to $147,414/year. <br />PM Peak Hour <br />