My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-2011 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2010-2019
>
2011
>
05-10-2011 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2012 12:23:00 PM
Creation date
6/15/2011 10:03:56 AM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
5/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Regulaz meeting of the Elk River Municipal Utilities Commission <br />May 10, 2011 <br />or expanding full-service restaurants. The program allows the restaurant to pay the Water Access <br />Chage fee over time through their utility bill versus at the time of the building permit is issued. <br />Theresa Slominski asked if the wording in the proposed payment program could be changed because <br />ERMU bills monthly, not quarterly, for water usage. Peter Beck is working on an agreement for this <br />payment program if passed by the Commission and City Council. Troy Adams stated this should be a <br />motion contingent upon the City Councils approval of SAC fees. <br />Al Nadeau moved to approve the Policy for the Water Access Charge Payment Program <br />contingent upon the City Councils approval of the Sewer Access Charge Payment Program. <br />Daryl Thompson seconded the motion. Motion carried 3-0. <br />5.6 Review Water Main Imnrovements within the Evans Avenue and 2°" Street 2011 Street <br />Rehabilitation Project <br />Justin Femrite, City Engineer, provided a map of the Evans Avenue and 2nd Street area and <br />explained the need for project. The estimated water main project cost or ERMU is $149,150. John <br />Dietz asked David Berg the age of the water main that would be replaced and he stated it was installed <br />in the eazly 1900's. <br />Daryl Thompson moved to approve the Water main Improvements within the Evans Avenue <br />and 20° Street Rehabilitation Project. Al Nadeau seconded the motion. Motion carried 3-0. <br />5.7 Gary Street Tower Reconditioning Project <br />On May 3, 2011 at 2:30 p.m. bids were opened for the Gary Street Tower Reconditioning <br />project. Discussion followed regazding the scope of the project. David Berg said the Manway <br />Access Tube and Tank Belly could wait another 10 years. After reviewing the bids, Bolten & Menk, <br />the engineering firm hired to oversee this project, recommends awazding Classic Protective Coatings, <br />Inc., the lowest responsive bidder. <br />Daryl Thompson moved to award the Gary Street Tower Recondifioning Project to Classic <br />Protective Coatings, Inc, the lowest responsive bidder, for $234,000. AI Nadeau seconded the <br />motion. Motion carried 3-0. <br />5.8 Water Tiered Rate Svstem <br />John Dietz discussed the tiered water rate system. The current requirement is for a two tiered <br />rate system not three like ERMU has. Other communities have only two tiers. John Dietz asked Tim <br />Simon to do a water analysis on a two tiered system to aid the large water users. Troy Adams <br />commented that the three tiered system was put in place per the DNR recommendation. The three <br />
The URL can be used to link to this page
Your browser does not support the video tag.