My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. ERMSR 06-14-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
06-14-2011
>
4.4. ERMSR 06-14-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 11:52:32 AM
Creation date
6/15/2011 9:47:21 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River .~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, Mi~I 5 5 3 3 0-043 0 <br />UTILITIES COMNIISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Mazk Fuchs <br />John Dietz, Chair Line Superintendent <br />Daryl Thompson, Vice Chair <br />AI Nadeau, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 14, 2011 4.4 <br />SUBJECT: <br />U date on 2011 Purchase of Directional Bore Ri <br />Discussion: <br />We received the directional bore rig in May. Chad Grande and Tom Geiser have taken on <br />the task of learning how to use it. Vermeer came to help train and assist with problems that <br />come up. <br />There aze three basic components. The first component is the bore rig puts ten foot rods <br />together to turn, push, and steer the head to a location where we need to stop, then we hook the <br />cable on the head and pull it in. The second component is a tank to mix the mud in and pump to <br />the bore rig. This mud goes thru the center of the rods and out a nozzle on the head. The mud <br />helps keep the hole open and keep the head coo]. The third component is the locator, with this <br />you can see where the head is. The locator operator talks to the bore rig operator to let him know <br />if he needs to go up or down and right or left depending on the upcoming terrain. <br />We aze using the bore rig in cable replacement projects and new projects where it is not <br />feasible to plow. This size of bore rig works good with most of the projects we have to do. <br />
The URL can be used to link to this page
Your browser does not support the video tag.