Laserfiche WebLink
5. Building_plans. Generally, the more developed building plans are, the better <br />informed the public, city staff, and the City Council can be during the review. I note <br />that the building floor plans are sketches, and are not issuable fox building permits. <br />Final drawings drawn by an architect will be necessary to verifh occupancy, load, <br />exiting, and other factors, prior to issuance of a building permit. <br />6. Drainage Calculations. The City Engineer has determined that drainage calculations <br />are not required at this time. <br />I hope this infom~ation is helpful; please do not hesitate to contact me if you have any questions. <br />I can be reached at 763/635-1034 <br />Sincerely, <br />Jeremy Barnhart <br />Platu~ing Manager <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br />vwvw.ci.elk-river.mn.us <br />