Laserfiche WebLink
City Council Minutes <br />October 20, 1997 <br /> <br />Page 8 <br /> <br />6.3. <br /> <br />feet to said South line~ thence East, along said South line, to the point of <br />beginning. <br /> <br />COUNCILMEMBER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />Request by Metro Gravel for Conditional Use Permit, Public Hearinq, Case No. CU <br />97-26 <br /> <br />Scott Harlicker indicated that Metro Gravel has requested a conditional use <br />permit for a second principle structure at 15683 Jarvis St. in the Ar-Mort <br />Commercial Park. Scott Harlicker reviewed the issues of this request as presented <br />in the staff report. He indicated that the Planning Commission recommended <br />approval. <br /> <br />Mayor Duitsman opened the public hearing. There being no one for or against <br />the matter, Mayor Duitsman closed the public hearing <br /> <br />COUNCILMEMBER HOLMGREN MOVED TO APPROVE THE CONDITIONAL USE PERMIT <br />REQUESTED BY METRO GRAVEL FOR A SECOND PRINCIPLE STRUCTURE AT 15683 <br />JARVIS STREET LOCATED IN THE INDUSTRIAL PARK WITH THE FOLLOWING <br />CONDITIONS: <br /> <br />MATERIAL AND EQUIPMENT STORED OUTSIDE MUST BE KEPT WITHIN THE <br />ENCLOSED OUTDOOR STORAGE AREA. <br /> <br />THE PARKING AND DRIVE AREA SHALL BE PAVED TO THE FRONT OF THE <br />BUILDING AND TO THE CONCRETE FUELING AREA. THE PERIMETER OF THE <br />PAVED AREA SHALL INCLUDE CONCRETE CURB AND GuI"rER. <br /> <br />3. NO PAVEMENT OR GRAVEL SHALL BE WITHIN 10 FEET OF ANY PROPERTY LINE. <br /> <br />THE DUMPSTER SHALL BE KEPT WITHIN A TRASH ENCLOSURE. THE EXTERIOR <br />OF THE ENCLOSURE WILL MATCH THE EXISTING BUILDING AND SHOULD BE <br />LOCATED EITHER BEHIND THE EXISTING BUILDING OR ADJACENT TO THE <br />PROPOSED BUILDING. <br /> <br />ALL THE CONDITIONS INCLUDED AS PART OF THE CUP APPROVED ON <br />FEBRUARY 13, 1989 AND AMENDED SEPTEMBER 16, 1991 SHALL BE <br />COMPLIED WITH. <br /> <br />25% OF THE EXTERIOR OF THE PROPOSED STRUCTURE SHALL CONSIST OF <br />MATERIAL LISTED ON THE APPROVED MATERIALS LIST OUTLINED IN THE <br />LANDSCAPE ORDINANCE. <br /> <br />o <br /> <br />THE SCHEDULE FOR COMPLETION OF THE REQUIRED IMPROVEMENTS BE AS <br />FOLLOWS: <br /> <br />1. PAVING AND CURB AND GUTTER COMPLETED BY JULY 1, 1998 <br />2. LANDSCAPING COMPLETED BY JULY 1, 1999 <br /> <br />COUNClLMEMBER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br /> <br />