Laserfiche WebLink
7.3. <br /> <br />How d R. Green Company <br />CONSULTING ENGINEERS <br /> <br />F=,rrnerly MSA <br />C,=nsulting Engineers <br /> <br />September 4, 1997 <br />File: 230325-20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Par'cway <br />P. O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE:. <br /> <br />TH 10/SIMONET DRIVE LEFT TURN LANE <br />CONSTRUCTION BIDS <br /> <br />Dear Council Members: <br /> <br />We have tabulated the construction bids opened on August 28, 1997 for the construction of the <br />left turn lane on TH 10 at Sim°net Drive. There were a total of two' bidders. The bidders and <br />their total bids are listed below: <br /> <br />1. Thomas and Sons $319,272.60 <br />2. Progressive Contractors Inc. $365,410.50 <br /> <br />Thomas and Sons has preformed this type of construction activity in the past, and their total bid <br />is within the estimate for the project. We have already submitted the information to M.[VDOT <br />and have received a verbal concurrence with the award of the bid to Thomas and Sons. <br />Therefore, we would recommend the City Council award of the TH 10/Simonet Drive Left Turn <br />Lane contract to Thomas .and Sons, as the lowest responsible bidder. Attached is a resolution <br />for the City Council's consideration, which accepts the bid and authorizes the executior~ of the <br />contract with Thomas and Sons. <br /> <br />If you have any questions regarding this issue, I will be in attendance at your City Council <br />meeting on Monday evening. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br /> P.E. <br />Terry ~urer, <br /> <br />TJMlet <br />Attachments <br /> <br />O:~oroj~230325~25-l:)405,sept <br /> <br /> <br />