My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. ERMUSR 05-10-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
05-10-2011
>
5.7. ERMUSR 05-10-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2011 11:53:47 AM
Creation date
5/10/2011 11:53:47 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gary Street Tower -Recommendation of Award Page 1 of I <br />Gary Street Tower -Recommendation of Award <br />Steve Nelson [stevene@bolton-menk.com~ <br />Sent: Tuesday, May 03, 2011 9:22 PM <br />To: Femrite, Justin; Berg, David <br />Attachments: ERMU Gary Street Tower Bi~l.pdf (40 KB) <br />Gentlemen, <br />The attached table summarizes the bid results and the various combinations of bid items the ERMU could choose <br />when awarding the Contract. According to this, either Classic Protective Coatings or Utility Services Co. will be <br />the lowest responsible bidder for the combination of items which the ERM[ J feels is in the best interest of the <br />project. Both of these contractors are capable of performing the work. [n addition: <br />• The specifications and bid documents did not contain any wording or ambiguities so as to force fhe <br />Contractor to build in additional contingencies. <br />• We feel that the bids received were competitive and responsive and rebidding of the project would not <br />provide any cost savings. <br />• There were no addenda and both contractors included a Bid Bond for 5% with their bid. <br />Accordingly, we recommend that the contract be awarded to Classic Protective Coatings or Utility Services Co. <br />based on the combination of items which the ERMU feels is in the best interest of the project and for the lowest <br />bid total as listed in the attached table. <br />Call with questions and if you want a signed letter of recommendation prepared once you select [he combination <br />of items you want to base your award on. <br />Thank you! <br />Steven G. Nelson, PE <br />Senior Project Manager <br />Bolton & Menk, Inc. <br />Consulting Engineers & Surveyors <br />7533 Sunwood Drive <br />Suite 206 <br />Ramsey, MN 55303 <br />P: (763) 433.2851 ext. 2855 <br />M: (651) 968.6315 <br />F: (763) 427.0833 <br />email: steveneC~bolton-menk.com <br />www.bolton-menk.com <br />OESlGNING FOR A BETTER TOMORROW <br />1~"ns://mail.ci.elk-rig-~r ^~n.us/owa/?ae=Tv~-,~ p,~IPMNote&~d ~~ ~~ ~AAACp409Ei^"O!~Oq... 5/4/201' <br />
The URL can be used to link to this page
Your browser does not support the video tag.