My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. ERMUSR 05-10-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
05-10-2011
>
5.1. ERMUSR 05-10-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2012 2:53:53 PM
Creation date
5/10/2011 11:30:36 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Ri <br />Municipal Utilities <br />8.20b FINANCIAL RESERVES POLICY <br />1.0 Purpose and Summary <br />In order to maintain stable rates and provide reliable services, Elk River Municipal Utilities <br />(ERMU) requires financial buffers in the form of reserves to mitigate changes in costs or <br />operational performance. For ERMU there are two utility funds, the Electric Utility and the <br />Water Utility. These funds shall have separate reserves. Their reserve balances shall be <br />classified as either Restricted for Debt Service or Unrestricted Designated Reserve. <br />The target levels for these reserves shall be determined by the criteria herein. These target levels <br />and target criteria will be reviewed annually, modified by Utilities Commission to support the <br />long-term goals of ERMU, and adopted with the annual budget. Unless otherwise specified by <br />bond covenants, these reserve balances shall be invested consistent with ERMU's Investment <br />Policy (policy number 8.20a). <br />2.0 Electric Utility Reserve Classifications <br />Restricted For Debt Service: This reserve is established to maintain compliance with bond <br />covenants. <br />The target level for this reserve shall be set at the level specified by bond covenants. <br />Unrestricted Designated Reserve: This reserve is established to address the short-term financial <br />variability inherent in operating an Electric Utility. Potential sources of this variability include <br />but are not limited to: risks associated with natural disasters, reduction in overall customer usage, <br />changes in total system load resulting from the actions of large customers, failure to achieve <br />budgeted levels of net income, changes in cost of purchased power, changes in interest income, <br />and general operational exposures. <br />The target level for this reserve shall be set at the sum of 6 months operating expenditures less <br />depreciation and less purchase power costs plus the sum of next year's total principal and interest <br />payments. <br />1 <br />- _ _ __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.