My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.8. SR 08-18-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
08/18/1997
>
6.8. SR 08-18-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:55 AM
Creation date
8/7/2003 12:51:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to the Mayor and City Council/P 97-7 <br />August 18, 1997 <br />Page 4 <br /> <br />Traffic/Access <br /> <br />As discussed by the Council at a recent meeting, the traffic in the area of <br />193rd and Evans is becoming a concern. Terry Maurer's office has recently <br />completed a traffic count for the intersection of Evans and 193rd. This report <br />was presented to the Council last month. As the concept plan illustrates, an <br />access is proposed to connect with Evans Street leading to the 193rd and <br />Evans Street intersection. The significance of additional traffic will depend <br />on the uses ultimately developed on the property. <br /> <br />Other issues to consider is whether the new access off 193ra should include a <br />turn lane. Furthermore, the current alignment of 193~a and any necessary <br />right of way should be included as part of this plat. <br /> <br />Indirect Source Permit <br /> <br />The Indirect Source Permit (ISP) is supposed to be issued August 13th. <br />Therefore, the Council may take final action on the proposed plat. <br /> <br />Fire Protection <br /> <br />The Fire Chief has indicated additional hydrants will be needed within the <br />development. The placement of these hydrants will depend on the actual <br />layout of the site. The hydrants will need to be covered with easements; <br />ideally, the hydrant locations should be identified and included on the plat. <br /> <br />Issues <br /> <br />Staffs concerns are not so much with the plat; rather, with the concept plan. <br />However, the two are somewhat tied to one another. The specific issues are <br />as follows: <br /> <br />· Addressing traffic within the area. <br /> <br />· Controlling the types of uses; particularly the building at the corner of <br /> 193ra and Evans. <br /> <br />· Protecting the natural characteristics of the site since it acts as a buffer to <br /> the residential. <br /> <br />Storm Drainage <br /> <br />In order to develop either lot in the subdivision, storm water ponds for <br />quality purposes will need to be developed. These ponds should be <br /> <br />\\elkriver\sys\shrdoc\council\p97-7x.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.