Laserfiche WebLink
Engineering Division <br />Public Works <br />2011 Projects <br />• <br />2011 Street Maintenance projects (Overlays and SC) <br />• <br />Interchange design Trunk Highway 10 At Armstrong <br />• <br />116/83 Intersection signalization (Legacy Christian Acedemy) <br />• <br />116 reconstruction (SLB –Germanium St) <br />• <br />Dysprosium Street reconstruction <br />• <br />Alpine Drive OL and trail <br />• <br />Parking ramp expansion <br />• <br />Rail Station design <br />• <br />Holiday / Oasis demolition <br />• <br />Chameleon Street paving (DREP under 3 miles to go) <br />•? <br />Long Term Road maintenance program <br />• <br />CSAH 5 Overlay <br />• <br />Sunfish Lake Boulevard and Alpine Drive signal <br />• <br />