My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 08-18-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
08/18/1997
>
6.1. SR 08-18-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:55 AM
Creation date
8/7/2003 12:47:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III STANDARDS <br /> <br />1 .) Boundary: <br /> <br />Extraction operations shall be conducted within the confines of the <br />boundaries indicated within this application. <br /> <br />2,) Setbacks: <br /> <br />Site setbacks will be fifty feet from property lines and right-of-ways <br />that are not adjacent to other areas where mining is allowed. The fifty <br />foot setback is applicable along 1 69, 221st' the southern boundary of <br />the southern parcel, and the western boundary that borders the <br />abandoned railroad track. The remaining property lines are adjacent to <br />properties which can be mined and the setback is 30'. Mining shall not <br />be conducted within 5 feet of a right-of-way of an existing public <br />utility. <br /> <br />221st Ave. runs through a portion of the property. It is anticipated <br />that this road will be lowered in the future as mining progresses to the <br />southern portion of the site. The setbacks from the right-of way <br />would be mined in conjunction with the lowering of the road. Figure 4 <br />illustrates alternative reclamation grades for this area if the road is <br />lowered. The grades assume mining activity to the west of the site. <br /> <br />3.) Fencing: <br /> <br />The site will be fenced and will meet the ordinance requirements of 4 <br />feet in height with a minimum support post placement of 10'. <br /> <br />4.) Appearance and Screening: <br /> <br />All equipment will be kept operational. Abandoned equipment and <br />rubbish will be periodically removed from the site. Within 3 months <br />after termination of mining, or within 3 months after termination of the <br />extraction license, all buildings and structures incidental to extraction <br />operations will be removed. The site will be graded in accordance <br />with the reclamation plan. <br /> <br />The perimeter of the site will be screened along 169, north of 221st <br />Ave. A berm will be constructed, seeded, and maintained. <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.