My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 08-18-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
08/18/1997
>
6.1. SR 08-18-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:55 AM
Creation date
8/7/2003 12:47:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the asphalt plant will be set up in the southeast corner of the parcel <br />north of 221st Ave. Approximately 10 acres will be prepared for the <br />plant site. Preparation will include some mining and leveling of the <br />area, and construction of a screening berm along the east/southeast <br />boundary of this parcel. Aggregate stockpiles and accessory <br />equipment will be located in the plant operations area. <br /> <br />Crushing and screening will take place throughout the mining <br />operation. The location of crushers will vary throughout the life of the <br />operation. Their locations will depend upon the location of the active <br />face. Conveyors will also be used throughout the site to convey <br />material from the active face to the processing equipment. <br /> <br />A water supply well a septic system will be constructed at the plant <br />area. <br /> <br />The site will be accessed off of 221 st Ave. Both an entrance road and <br />an exit road are proposed to be constructed. <br /> <br />Areas to be mined will be cleared and grubbed and then stripped as <br />needed. Topsoil will be stockpiled on site. Overburden will be <br />stockpiled or used as backfill to reclaim completed portions of the <br />mine. Sand and gravel will be excavated from the active mining area <br />and brought to the processing area. <br /> <br />The site will be mined in phases. Initially the southern 24 acre parcel <br />will be mined. A culvert is proposed to be installed beneath 221st <br />Ave. to allow a conveyor to transfer material from the south side of <br />221st to the north side of 221st. This would eliminate the majority <br />of truck traffic moving between the two sites. <br /> <br />Mining will also begin in the northern portion of the property, adjacent <br />to the Ell( River Landfill and progress to the south towards the <br />processing plant. <br /> <br />No explosives will be used at the site. <br /> <br />9.) <br /> <br />Drainage, Erosion Control, Sedimentation, Dust, Access Control and <br />Security: <br /> <br />Surface water drainage is directed to a Iow area within the excavation. <br />Collected surface water infiltrates into the underlying soils and/or <br />evaporates. Surface water drainage will not be directed off site. <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.