Laserfiche WebLink
ITEM 6.1. <br /> <br />City of <br /> <br />River <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />MEMORANDUM <br /> <br /> MAYOR AND CITY COUNCIL <br /> <br /> STEPHEN ROHLF, BUILDING <br /> AND ZONING ADMINISTRATOR <br /> <br /> AUGUST 18, 1997 ~-- <br /> <br /> CONDITIONAL USE PERMIT FOR <br /> MINERAL EXCAVATION AND <br /> HOT-MIX ASPHALT PLANT BY <br /> TILLER CORPORATION CU 97-19 <br /> <br />REQUEST: <br /> <br />Tiller Corporation is seeking a conditional use permit for mineral excavation <br />(gravel mining) on a 133 acre site. The proposed site is Zoned ME- "Mineral <br />Excavation Overlay District" and was studied as part of the City's <br />Environmental Impact Statement (EIS) on Mineral Excavation. <br /> <br />In addition, Tiller is proposing to relocate their hot-mix asphalt plant to this <br />site. This plant is currently located in the southwest corner of the <br />intersection of Co. Rd. #33 and Highway 169. The hot-mix plant is <br />considered a related facility to the gravel mining and may be reviewed under <br />the same conditional use permit process. <br /> <br />ATTACHMENTS: <br /> <br />Mineral excavation application by Tiller corporation, dated June 24, <br />1997. This document contains a description of the proposed operation <br />including reclamation plans. The legal description and a vicinity map of the <br />subject property is also included in Tiller's application. <br /> <br />A letter dated, July 14, 1997 from John Lichter of B. A. Liesch and <br />Associates, City Environmental Consultant. <br /> <br />A letter dated, July 16, 1997 form Terry Maurer, City Engineer. <br /> <br />Draft conditional use permit. The draft conditional use permit attached <br />contains staffs recommended conditions of operation for this request. <br /> <br /> f:\shrdoc\b&z\stever\tilrcup.doc <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />