4. Completion of Construction of the Project <br />Near the close of construction and after construction completion of the Project the Grantee shall be subject to the <br />following: <br />(1) At least 60 (Sixty) days before the initiation of operation of all of the new treatment units, and all of the <br />associated delivery and return (if applicable) conveyance systems, the Grantee shall notify MPCA of the <br />anticipated start-up date to schedule an inspection of the Project. Initiation of Operation is defined in <br />Minnesota Rules 7077.0105, Subpart 18a. <br />(2) The Grantee will submit a Performance Certification letter 90 (Ninety) days after the initiation of operation <br />date. The Performance Certification letter shall be signed by the Grantee and a professional engineer <br />registered in the State of Minnesota, and shall include Statements that address the following performance <br />standards: <br />a. The project has been completed according to the approved construction Plans and Specifications and <br />change orders; <br />b. The Grantee (municipality) has sufficient number of trained and capable personnel with the ability to <br />provide adequate operation and maintenance of all the new project components; <br />c. The project accepts the hydraulic and organic loadings to the extent described in the approved design <br />Specifications and the NPDES/SDS permit conditions; <br />d. The project new facilities meet the effluent. limitations as assigned in the NPDES/SDS permit. <br />(3) The Grantee shall submit one copy of "as-built" Plans and Specifications in the electronic format as <br />identified the MPCA website at: http://www.pca.State.mn.us/index.php/view-document.html?gid=15492 <br />Also, observe the Website-Posting Requirement in the Grant Contract). <br />Grant (Rev. 11/08) <br />CR <br />