My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 08-18-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
08/18/1997
>
4.3. SR 08-18-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:55 AM
Creation date
8/7/2003 12:41:41 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 95 - 1 <br /> <br />CITY OF ELK RIVER <br /> <br />VERSION 2 <br /> <br />AN ORDINANCE AME~ING THE CODE OF ORDINANCES OF THE <br />CITY OF ELK RIVER TO REQUIRE CONNECTION TO THE CITY <br />WATER UTILITY WHEN AVAILABLE, AND TO REQUIRE PAYMENT <br />OF DULY ADOPTED FEES AND CHARGES FOR CONNECTION TO AND <br />USE OF THE CITY WATER UTILITY <br /> <br /> The City Council of the City of Elk River does hereby ordain as <br />follows: <br /> <br /> Section 1. That the Code of Ordinances of the City of Elk <br />River is amended to add new Section 1304, entitled "Connection <br />Water Utility,,, as follows: <br /> <br /> 1304.00 - Connection to Water Utilit - Fees and Char es. <br /> 1304.00 - Connection to Water Utility Required. <br /> <br /> The following buildings shall be required to be connected to <br /> the City water utility: <br /> <br />(1) <br /> <br />(2) <br /> <br />(3) <br /> <br />to <br /> <br />Ail buildings connected to the water utility on the <br />date of adoption of this ordinance shall remain <br />connected to the water utility for so long as the <br />building is occupied or used for any purpose. <br /> <br />All buildings constructed in the future on property <br />to which water utility service is available at the <br />time a Certificate of Occupancy is issued for the <br />building shall be required to connect to the water <br />utility prior to occupancy. <br /> <br />All buildings constructed in the future on property <br />to which water utility service becomes available <br />following legal occupancy of the building shall be <br />required to connect to the water utility as follows: <br /> <br />(a) All residential buildings with one or two <br /> residential units shall be required to connect <br /> to the water utility within two (2) years from <br /> the date water utility service becomes available <br /> to the property or the date the property is <br /> assessed for water utility improvements <br /> whichever is later. ' ' <br /> <br />(b) <br /> <br />Ail 'other buildings shall be required to connect <br />to the water utility within ninety (90) days <br />from the'date water utility service becomes <br />available to the property. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.