My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. ECCSR 04-21-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Energy City Commission
>
ECC Packets
>
2010-2019
>
2011
>
04-21-2011
>
5. ECCSR 04-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:01:37 AM
Creation date
4/20/2011 11:01:37 AM
Metadata
Fields
Template:
City Government
type
ECCSR
date
4/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connexus, CentexPoint) along with a letter indicatuig eligible utility rebates. <br />An Elk River Energy City Commission member will be asked to participate <br />in the EDA Finance Committee review and recoimnendation of the <br />application. <br />The loans will be secured by personal and corporate guarantees, and if <br />applicable a lien on equipment financed and subordinate mortgage on the <br />property. Installation must be certified through a licensed contractor and <br />electrician. <br />Loans less than X75,000 do not qualify as a "business subsidy" by state law <br />and are therefore exempt fiom state businesssiibsidy reporting requirements. <br />However, the EDA may track jobs retauied and created as a result of the <br />project <br />ID~Gcio Love Fund Policy & Giudelines Page 5 of 16 <br />Amended March 2011 DAAFI' <br />
The URL can be used to link to this page
Your browser does not support the video tag.