My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 04-04-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
04-04-2011
>
5.5. SR 04-04-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 10:46:28 AM
Creation date
4/1/2011 10:46:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/4/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Give a complete description of the proposed project and related new construction. Attach additional <br />sheets as necessary. Emphasize construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes. Include modifications to existing equipment or <br />industrial processes and significant demolition, removal or remodeling of existing structures. Indicate the <br />timing and duration of construction activities. <br />c. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need <br />for the project and identify its beneficiaries. <br />The proposed project involves adding approximately 30.6 acres to an existing mining operation ovmed <br />and operated by Plaisted Companies (Plaisted). Approximately 9.5 acres of the property v~~ill be used for <br />buffer along highway/street rights-of--way and neighboring properties. Buffer areas will not be mined and <br />vegetative screening will be maintained. The project will allow the removal of a deposit of sand and <br />gravel that will be processed into construction aggregates to serve the growing demand within the local <br />area and the City of Elk River. Mining the additional azea will improve overall end use grades for the <br />Plaisted operation. Portions of the existing site have been in operation since the 1980's. The existing <br />operation, as well as several other operations in the vicinity, were the subject of an Elk River Mining <br />District Environmental Impact Statement completed in June, 1994. Initially the subject parcel was <br />included within the gravel mining district boundary, but was removed because it was not controlled by a <br />mining operator at that time. <br />Active misting will begin by stripping topsoil and overburden from the site using scrapers and dozers. <br />Extraction of the aggregate deposit will be accomplished with loaders working from the floor of the <br />existing nvning operation. Equipment will be placed to insure compliance with both daytime and <br />nighttime noise standards. <br />Material will be conveyed to Plaisted's main operations and stockpiling azea located to the south of the <br />subject parcel for further processing. Product stockpiling will also occur in the existing processing and <br />operations area and all hauling of aggregates will occur from the main processing area. There will be no <br />access to 213 Ave NW or Highway 169 which abut the subject property to the north and east, <br />respectively, from the proposed expansion area during the mining operation. This project will not impact <br />the number of trucks trips to and from the facility. Truck traffic is a function of demand. The project is <br />expected to increase the overall life of the facility by approximately 5-10 years. The actual increase will <br />depend upon market demand. <br />d. Are future stages of this development including development on any other property planned or likely to <br />happen? _Yes _X_No <br />If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental <br />review. <br />e. Is this project a subsequent stage of an earlier project? X Yes _No <br />If yes, briefly describe the past development, timeline and any past environmental review. <br />The subject property is adjacent to an existing mining facility owned and operated by Plaisted. The <br />existing operation as well as several other properties were the subject of an Elk River Mining District <br />Environmental Impact Statement completed in June, 1994. Initially the subject parcel was included in the <br />gravel mining district boundary, but was ultimately removed because it was not controlled by a mining <br />operator. Portions of the existing operation have been active since the 1980's. <br />7. Project magnitude data <br />Total project acreage: 30.6 (21.1 acres will be mined and 9.5 acres will remain as setback and buffer) <br />Number of residential units: unattached NA attached NA maximum units per building <br />Commercial, industrial or institutional building area (gross floor space): total square feet NA <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.