My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 04-04-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
04-04-2011
>
5.5. SR 04-04-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 10:46:28 AM
Creation date
4/1/2011 10:46:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/4/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--~ ~ -x= ~/linnesc~~a P~~tutiQn ~a~tr~! ~ge~c~r <br />.~,~.~. <br />~ 520 Lafayette Road North I St Paul, MN 55155-4194 ~ 651-296-6300 1800-657-3864 ~ 651-282-5332 TTY I www.pcastate.mn.us <br />March 9, 2011 <br />Ms. Rebecca Haug <br />Environmental Administrator <br />City of Elk River <br />1306 Orono Parkway NW <br />Elk River, MN 55330 <br />Re: Plaisted Companies Sand and Gravel Mining Operation Environmental Assessment Worksheet <br />Dear Ms. Haug: <br />Thank you for the opportunity to review and comment on the Environmental Assessment Worksheet <br />(EAW) for the Plaisted Companies Sand and Gravel Mining Project (Project) in Sherburne County, <br />Minnesota. The Project consists of the extraction and processing of aggregates from a 30.6-acre parcel <br />of property adjacent to an existing sand and gravel mining operation. Regarding matters for which the <br />Minnesota Pollution Control Agency (MPCA) has regulatory responsibility and other interests, MPCA <br />staff has the following comments for your consideration. <br />Proiett Maenitude Data (Item 71 <br />The EAW indicates there will be no buildings on the site. However, aerial photos indicate several <br />buildings on the north end of the site. Please indicate if these buildings will be removed and if there are <br />existing wells for these buildings that have not been listed in Item 13. <br />Permits and Approvals Required (Item 8) <br />This item should also include an air emission permit as being required from the MPCA. Since the EAW <br />does not discuss the Project's potential to emit for all criteria pollutants, it is not possible to determine <br />from the information provided whether the Project will require a Nonmetallic Mineral Processing <br />General Permit or a Part 70 Title V Permit. It is the responsibility of the Project proposer to determine <br />the type of air permit necessary for this specific operation. Application forms and instructions are <br />available on the MPCA's website at http://www.pca.state.mn.us/air/permits/forms.html#4a. <br />The Project proposer should also be aware that operation of a stationary crusher and aggregate spread <br />that is greater than 25 tons per hour capacity, or greater than 150 tons per hour portable, and assuming <br />the equipment is newer than 8/31/83, is subject to 40 CFR 60 Subpart 000 of the federal New Source <br />Performance Standards. Under this subpart, the facility owner must conduct specific performance <br />testing (i.e., opacity testing) when the mining site is in normal operation. <br />Depending upon crusher size (tons per year) and year of manufacture, and generator horsepower and <br />year of manufacture, the operation may also be subject to Subpart ZZZZ of the federal National <br />Emissions Standards for Hazardous Air Pollutants, which has additional reporting requirements. If you <br />have any questions on air permitting issues, please contact 1im Kolar in our St. Paul office at <br />651-757-2174. <br />Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.