My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 03-21-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-21-2011
>
7.1. SR 03-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2011 10:43:58 AM
Creation date
3/18/2011 10:40:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~o~~NNesorgyo Minnesota Department of Transportation <br />' ~ District 3 <br />~~~'aF taP~gao 7694 Industrial Park Road <br />Baxter, MN 56425 <br />March 1, 2011 <br />Justin Femrite <br />Elk River City Engineer <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Tel: 218-828-5700 <br />Fax: 218-828-5814 <br />Toli Free: 1-800-657-3971 <br />Re: Official Detour Route <br />S.P. 7106-79 (TH 169) <br />Southbound Bridge Railing Replacement and Low-slump Concrete Overlay <br />Located on TH 169 in Elk River over TH 10 <br />Dear Mr. Femrite, <br />A project is scheduled to remove and replace the bridge railings and pour a new low-slump <br />concrete overlay on the southbound TH 169 bridge that crosses over TH 10 in Elk River. The <br />project will occur during the 2011 construction season. To accomplish the proposed work, the <br />eastbound TH 10 to northbound TH 169 traffic movement and the southbound TH 169 to <br />eastbound TH 10 traffic movement will need to be detoured. I would like to notify you of the <br />proposed official detour routes, route specific limitations, and to outline the associated <br />compensation owed to the City of Elk River. <br />We are planning to utilize portions of Main Street, and Twin Lakes Road as the official detour <br />routes for the project. It is anticipated that the detour will need to be in place for approximately <br />one month during the month of June. A map indicating the proposed official detour routes is <br />.~itt~^.he~... <br />The calculations that accompany this letter are estimates only. The developed method used to <br />calculate detour compensation is The Gas Tax Method from the "Detour Management Study" of <br />1991. The formula to calculate detour compensation is as follows: <br />Compensation = 0.00513 x Trunk Highway ADT x Length in miles x Duration in days <br />The derived ADT values are from traffic turning movement counts taken in 2009 and the <br />segment length is from Mn/DOT's Local Log point Listing database. The final amount of <br />compensation will depend on the actual duration of the detour. <br />An Equal Opportunity Employer <br />~.. <br />is ~~~ ,~ <br />__, <br />
The URL can be used to link to this page
Your browser does not support the video tag.