My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.7. SR 03-21-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-21-2011
>
3.7. SR 03-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2011 10:30:38 AM
Creation date
3/18/2011 10:30:38 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 2 (Highway 10 lift station panel) <br />4 pump Stainless steel control panel, 480 volt, double door, with 18 inch, skirting, to <br />include the following <br />4 Mitsubishi F700 VFD' S for operation of 25 HP pumps <br />2 Across the line bypass starters for 25 HP pumps <br />4 Pump breakers <br />1 Main service disconnect breaker <br />1 Emergency generator breaker and manual transfer switch <br />1 Control transformer <br />1 Lightning arrestor <br />4 Running time meters <br />1 Phase monitor <br />1 Duplex receptacle <br />2 CT-1500 4 pump controllers 0 -10 feet 1 as main controller 1 as a completely <br />redundant control system. The operator my.select which controller is the main <br />controller or redundant controller with a selector switch. Both controllers will be <br />able to operate the VFD' S and select alternation of pumps in any sequence <br />needed. Main Controller and redundant controller will only allow 2 pumps to run <br />when the generator is running. The operator will have the ability to choose which <br />2 pumps will run on the generator <br />2 Submersible transducers 4-20ma <br />1 Dry contacts for High alarm, Low alarm, Pump fails and Power fail. <br />4 Pump run lights <br />1 18 inch x 18 inch area for city supplied alarm system <br />1 200 watt condensation heater 120 VAC fan forced <br />1 Generator receptacle to used off old control panel field installed by electrician <br />1 Installation of new conduit from wet well to new panel location no less than 2- <br />inch conduit <br />1 Lot of start-up <br />Total price for above control panels ............$46,450.00 + freight and tax <br />If we can be of further assistance please give us a call <br />Thank You, <br />uality Flow Systems Inc. <br />im Pettit <br />
The URL can be used to link to this page
Your browser does not support the video tag.