My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.8. SR 07-28-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
07/28/1997
>
4.8. SR 07-28-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:54 AM
Creation date
8/6/2003 7:16:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/28/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEETING OF THE ELK RIVER CITY COUNCIL <br />HELD AT THE ELK RIVER CITY HALL <br />MONDAY, JUNE 2, 1997 <br /> <br />Members Present: <br /> <br />Members Absent: <br />Staff Present: <br /> <br />Mayor Duitsman; Councilmembers Dietz, Thompson, <br />Holmgren and Farber <br /> <br />None <br /> <br />Pat Klaers, City Administrator; Lori Johnson, Assistant City <br />Administrator; Terry Maurer, City Engineer; Cliff Skogstad, <br />Building Official; Phil Hals, Street/Park Superintendent; Debbie <br />Kleckner, Recording Secretary <br /> <br />o <br /> <br />Capital Improvement Proqram <br /> <br />Terry Maurer reviewed the April 9, 1997 Otsego Sanitary Sewer and Treatment <br />Capacity Report with the City Council. <br /> <br />Ice Arena Project <br />The Council concurred that 50 percer)t of construction project over-run costs be <br />covered from the Equipment reserves and 50 percent from the Capital Projects <br />reserve. <br /> <br />City Council Minutes <br />June 2, 1997 <br />Page 2 <br /> <br />Cliff Skogstad, Building Official, was present to explain the proposed sub-floor <br />heating system for the ice arena locker room area (Agenda Item 6.5.) <br /> <br />COUNClLMEMBER FARBER MOVED TO APROVE COST SHARING WITH YOUTH <br />HOCKEY FOR ADDITIONAL COSTS ASSOCIATED WITH SUB-FLOOR HEATING <br />ALTERNATE, AND TO ADD SPRINKLING HEAD CORRECTIONS IN THE LOCKER ROOM <br />AREA AS PART OF THE ICE ARENA CONSTRUCTION BUDGET. COUNClLMEMBER <br />HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />The PA system, security system and Zamboni machine for the ice arena were <br />discussed. The Council directed staff obtain additional quotes for a PA system <br />and s,.ecurify syste_m and expressed their support for use of Equipment reserves <br />and Capital Project reserves to fund these two items. The Council also directed <br />the City Administrator to send a letter to the School District regarding their offer to <br />share the cost up to $5,000 for the purchase of a PA system. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.