Laserfiche WebLink
Lake Orono 2010 Plan Review <br /> <br />. ... <br /> LOIA, Elk River A Permit <br /> Community, City of Elk Application to the <br /> River, Sherburne LOIA, City of Elk River, DNR was denied. <br />Curly Leaf Pond SWCD, DNR, Elk River DNR, Elk River Mechanical <br />Weed Control Oct 2010 Utilities, S2S Labor Utilities,S2S removal continues <br /> Deferred in <br /> 2010 due to <br /> planned lake <br />Fish Stocking draw down n/a n/a n/a <br /> LOIA, City of Elk River, Labor and Lab LOIA, City of Elk River, <br />Water Testing On Going Sherburne SWCD Costs Sherburne SWCD <br /> SWCD: $1,500 <br /> Labor & Equip <br /> LOIA: $500 <br /> Labor & Equip <br /> LOIA, City of Elk River, City: $2,000 <br />LOIA <br />$900 Cost Share: <br /> Sherburne SWCD, : LOIA, City of Elk River and <br />Dredging Study Summer 2010 Wenck Total =$5,000 Sherburne SWCD <br />5 <br />Copyright ©2011 -Lake Orono Improvement Association, Inc. All Rights Reserved <br />