Laserfiche WebLink
Brookings Line Project <br />Projected cost $827M (2010$) <br />250 mile 345 kV line <br />113 Double circuit ready <br />[3 9 substations <br />0 Subscriptions illustrated below <br />(subject to change) <br />E <br />0 <br />0 <br />Xcel 72.1% <br />GRE (CM) 16.5% <br />I ow <br />Z3 <br />