My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 07-21-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
07/21/1997
>
7.1. SR 07-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:53 AM
Creation date
8/6/2003 7:03:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7. THAT THE NATURAL VEGETATION BETWEEN THE ASPHALT PLANT AND <br />HIGHWAY 169 BE LEFT TO ACT AS SCREENING. <br /> <br />8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO A VOID DUST. <br /> <br />9. THAT COMMERCIAL ASPHALT CO. REIMBURSE THE CITY FOR THE COST OF <br />REVIEWING THEIR PROPOSAL. THAT THE CITY HAS THE RIGHT TO CLOSE THIS <br />OPERATION DOWN IF THERE IS IMMINENT DANGER AND THAT CITY STAFF <br />HAS THE RIGHT TO INSPECT THE PREMISES AT ANY REASONABLE HOUR <br />FOLLOWING NOTIFICATION. <br /> <br />1 O. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT ARE FROM 7:00 <br />AM TO 7:00 PM, SEVEN DAYS A WEEK. HOWEVER, HOURS CAN BE <br />EXTENDED FOR SPECIAL CASES BY THE BUILDING AND ZONING <br />ADMINISTRATOR AS LONG AS THE ADDITIONAL HOURS DO NOT CREATE A <br />NUISANCE FOR SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS <br />MUST BE ADHERED TO AT ALL TIMES DURING THE OPERATION OF THIS PLANT. <br /> <br />11. THAT THE BAGHOUSE IS TESTED ONCE PER MONTH FOR LEAKS DURING THE <br />OPERATING SEASON AND THE RESULTS OF THOSE TESTS ARE COPIED TO THE <br />CITY. <br /> <br />12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN ONE YEAR AND A NEW <br />PERMIT BE OBTAINED AT THAT TIME. <br /> <br />13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE PLACED IN SURFACE <br />WATER AND FURTHER THAT RUN-OFF FROM THESE STOCKPILES IS DIRECTED <br />A WAY FROM ANY SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE <br />LIMITED TO THE AMOUNT OF MATERIAL THAT COULD POSSIBLY BE USED IN <br />ONE YEAR, BUT NOT NECESSARILY TO WHAT WILL BE USED IN ANY ONE <br />GIVEN YEAR. FURTHER, THAT THE CITY UNDERSTANDS WITH THIS STIPULATION <br />THAT SOME RECYCLABLE MATERIALS WILL BE RETAINED OVER THE WINTER SO <br />THAT RECYCLING CAN START AT THE SAME TIME AS SPRING START UP FOR <br />THE ASPHALT PLANT. <br /> <br />14. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO <br />RESOLVE PROBLEMS WITH NOISE IF THEY ARISE. <br /> <br />15. THAT COMMERCIAL ASPHALT CO. CONTROL ODOR FROM THEIR PLANT TO <br />ACCEPTABLE LEVELS. <br /> <br />DATED this _ day of ,1997. <br /> <br />cup-asphlbz/stever <br />
The URL can be used to link to this page
Your browser does not support the video tag.