Laserfiche WebLink
~Q~r~-~~nr ~'~c~~vo~~~~FS; Inrc. <br />6588 f47stAu~nue NW, Ramsey. MN 553Q3 7G3-433-9175 78323-4T39 Fax <br />February 28, 2411 <br />Mr. Justin Femrite, P.E. <br />City of Elk River <br />13505 Orono Parkway <br />Elk River, MN 55330 <br />RE: Proposal for Geotechnical Services <br />Elk River Public Works Facility <br />Elk River, Minnesota <br />NTI Proposal P1057 <br />We are pleased to submit our proposal to perform Geotechnical Services for the above <br />referenced project. The purpose of this study is to collect representative soil samples, analyze <br />the subsurface soil and groundwater conditions and to furnish a detailed geotechnical <br />engineering report with appropriate design and construction recommendations. <br />The project consists of the construction of a new public works facility for the City of Elk River. <br />SCOPE OF WORK <br />The following is our proposed work scope based on your RFP. <br />NTI will contact the Minnesota "One-Call" system for clearance of public utilities within the <br />area of the soil borings. The cost of a private locator is a reimbursable expense. NTI will <br />provide a private locator should it be necessary. <br />We will mark the boring locations based on the layout plan you have provided. We will make <br />you aware of these field activities before proceeding to the. <br />NTI will then mobilize a truck mounted drill to the site to drill ten (10) standard penetration soil <br />borings drilled to a depth of fifteen (15) (total of 150 lineal feet of drilling). If soft soils, fill or <br />organic soils are encountered near termination in the building pads we will continue drilling until <br />a minimum of five (5) feet of suitable foundation soils are observed. This drilling program will <br />take 1 to 1 1/2 days to complete. <br />Minneapolis ~ Fargo • Grand Forks <br />