Laserfiche WebLink
~' <br />February 23, 2011 <br />Mr. Justin Femrite, PE <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />MIDWEST Proposal # 29606-11P <br />Email: jfemrite~a ci.elk-river.mn.us <br />RE: Land Surveying Services for Public Works Facility Property, Elk River, Minnesota <br />Dear Justin, <br />We are pleased to present the following proposal for land surveying services for the City Public <br />Works Facility located on Proctor Avenue, Elk River. MIDWEST Land Surveyors & Civil <br />Engineers, Inc. would complete our services within three weeks upon authorization to proceed. <br />PROJECT DEFINITION: <br />The project is presently defined as the Public Works property and contains approximately <br />40± acres. The City of Elk River has requested a proposal from our firm for a Boundary <br />and Topographic map of this site. <br />LAND SURVEYING SERVICES: <br />• Boundary Survey <br />MIDWEST will provide a boundary survey of the City property based upon current <br />records at the County Court House. Iron monuments and a wood lathe would be placed <br />at each property corner. <br />• Topographic Survey <br />MIDWEST will obtain field elevations to produce a map that would provide the City <br />with 2-foot contour intervals with spot elevations at various locations. Also this map will <br />show above-ground and under-ground utilities from visible surface evidence, and <br />available records at the City. <br />• Map Drawing <br />MIDWEST will provide a map with descriptions showing the boundary lines of the City <br />owned property and all topographic features along with 2' contours. An AutoCADD disc <br />would also be provided with the hard copy drawing. <br />MIDWEST <br />-- <br />Land Surveyors & Civil Engineers, Inc. <br />710 East River Road • Anoka, MN 55303 <br />(763) 712-9099 • Fax (763) 712-9055 <br />Toll Free (888) 786-6909 <br />• Compensation <br />MIDWEST proposes compensation for all services rendered would be a lump sum fee of <br />$13,960. Invoicing will be submitted to the City within I S days of project completion. <br />