My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.6. SR 03-07-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-07-2011
>
3.6. SR 03-07-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 9:34:06 AM
Creation date
3/4/2011 9:34:04 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oliver Surveying & Engineering, Inc. <br />Lund Surveying • Civil Engineering • Land Planning <br />February 22, 2011 <br />Justin Femrite <br />Elk River City Engineer <br />13065 Orono Parkway <br />EIk River, MN 55330 Via E-mail: jfemrite@ci.elk-river.mn.us <br />Re: City of EIk River Public Works Facility <br />Dear Mr. Femrite: <br />Oliver Surveying & Engineering, Inc., would like to than]: you for the opportunity of submitting <br />this proposal for surveying services involved with a boundary and topographic survey of the <br />Public Works Facility at 19000 Proctor Avenue in Elk River. <br />Our prior work consisting. of a Wetland Exhibit, Grading Plan, Site Plan, SWPP Plan and <br />construction. details, relied upon a topographic survey that was provided by the city. Having <br />visited the site, it doesn't appear that our plans were implemented. There have been numerous <br />changes since the last topographic survey. Various buildings have been removed and new <br />buildings have been built. It appears the entire site has been repaved and numerous areas have <br />been paved that were not paved before. Storm sewer has been added that is not shown on our <br />plans. We will try to use the existing topography where things haven't changed, such as wetland <br />edges, fences and other features, but I feel that almost everything will need to be redone. <br />• We propose to complete boundary survey of PID's 75-128-3402, 75-427-Oi60, 75-427- <br />0180 and 75-427-0170 along with a new topographic survey with 1 foot contours and <br />spot elevations over the area depicted in the Public Works Facility Topo Area exhibit <br />you provided for a lump sum of $9500. <br />If additional area is to be included, we reserve the right to modify our proposal, or complete the <br />additional work at our normal hourly rates, at your discretion. We expect the work to be <br />completed within 3 weeks of notice to proceed. <br />You will be invoiced upon completion for our professional services and for reimbursable <br />expenses which have been incurred. A rnonthly finance charge of 1 1/2% (annual rate of 18%) <br />will be made on any delinquent amount due more than 30 days after the date of the invoice and <br />you will be responsible far any costs of collection, including reasonable attorney fees. <br />580 Dvdge Ave. Elk River, NfN55330 •7h3.441.2072 • .fac. 763.441.665 • wyvrv.oliver-se.cvrn <br />
The URL can be used to link to this page
Your browser does not support the video tag.