My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.6. SR 03-07-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-07-2011
>
3.6. SR 03-07-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 9:34:06 AM
Creation date
3/4/2011 9:34:04 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River <br />Proposal SC-11-00955 <br />iViarch 2, 2011 <br />Page 3 <br />• Logs of the borings describing the materials encountered and presenting the results of our <br />groundwater measurements and laboratory tests. <br />A summary of the subsurface profile and groundwater conditions, <br />Discussion identifying the site conditions that wits impact structure design and performance, <br />qualifying the nature of their impact, and outlining alternatives for mitigating their impact. <br />• biscussion regarding the reuse of on-site materials during construction and the impact of <br />groundwater on construction. <br />^ Recommendatiansfor preparing structure subgrades, including excavation support, if <br />appiicabie, and the selection, placement and compaction of excavation backfiil and other <br />structural fill. <br />• Recommendations for the design of spread footing foundations, grade supported slabs and <br />pavement areas. <br />One original report and cane copy of our report will be submitted to you. At your request, additional <br />copies can be prepared for other project team members. if you anticipate that additional copies will be <br />needed, please request them prior to the report being completed and forwarded to you so we can <br />prepare a copy (ist for the recipients and distribute the additional reports expediently. <br />Adsii#ionai Services <br />if borings must be extended beyond their intended termination depths, we wiii charge an additional $15 <br />per lineal foot beyond the originally intended termination depth. if you would tike us to provide GPS <br />staking, we will charge an additional $ft?0. <br />Cast <br />We wiii furnish the services:described in this proposal. for a lump sum fee of $x,350. <br />Our work may extend over severs! invoicing periods. As such, for work that is performed during the <br />course of each invoicing period, we will submit partial progress invoices. <br />Schedule <br />We anticipate the field exploration can begin within approximately 1 to Z weeks of written authorization; <br />the field exploration wiU take 2 days to complete. Sample classification and laboratory testing wiii likely <br />take an additional week. We will pass along results, however, as they are obtained and reviewed. <br />~~ <br />~~~~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.