Laserfiche WebLink
Proposal for Geotechnical Services <br />Elk River Public Works Facility <br />Elk River, MN <br />cosT <br />We will perform the base geotechnical exploration and report described above for a fixed fee of <br />$2,600. Additional drilling footage, if necessary to reach competent, non-organic native soils, <br />will be invoiced at a rate of $12/foot. <br />SCHEDULE <br />Assuming authorization to proceed is given by March 8, 2011, the field work will begin in by <br />March 15, and the report will be issued by March 22 or sooner. Boring logs and verbal <br />information regarding our findings can be provided within 1 to 2 days after the field work has <br />been completed. <br />ACCEPTANCE <br />Please indicate your acceptance of this proposal by signing on the signature block below, and <br />returning a copy to us. The attached General Conditions are an integral part of this proposal. <br />This proposal is effective until May 1, 2011. <br />We thank you for the opportunity of submitting this proposal and look forward to working with <br />you through both the design and construction phase of this project. If you have any questions <br />regarding this proposal please contact the undersigned at 763-433-9175. <br />NORTHERN TECHNOLOGIES, INC. CITY OF ELK RIVER <br />.. By: <br />Anthony Francis, P.E. <br />Project Engineer Printed Name: <br />~~G~~ Title: <br />Stephen Johnston, P.E. <br />Regional Manager/Vice President <br />Attachment: General Conditions <br />Date <br />Minneapolis • Fargo • Grand Forks <br />