My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.8. SR 03-07-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-07-2011
>
3.8. SR 03-07-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 9:30:47 AM
Creation date
3/4/2011 9:28:54 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Proposals <br />2011 Street Improvements Page 3 of 6 <br />-------------------------- <br />9. Insurance Certificate <br />A brief description of each section is included below. <br />1. General Information <br />General information and a brief history of the Consultant's firm. Include similar <br />information on key subconsultants, if any, proposed for the project. <br />2. Project Understanding <br />A summary of the Consultant's understanding of this project. <br />3. Project Apt~rrach <br />Provide specific approaches, methods, and assumptions that will be utilized to <br />accomplish the development of this project, including each work phase. Include <br />statements about the Consultant's approach to coordinating a public process and the <br />special assessment procedures. <br />4. Proposed Project Team and Experience <br />^ Identify the key project team members and describe their specific roles on the <br />project. Include key team members from subconsultant firms. <br />^ Describe relevant experience and provide information on at least three (3) reference <br />projects completed in the last five (5) years. Provide personal references and contact <br />information. <br />^ Include one-page resumes o~ for key members of the project team, including field <br />personnel. <br />^ Include specific descriptions of proposed team members' roles on reference projects. <br />Provide a contact name and information for each of the work items. <br />5. Schedule <br />A proposed schedule from project initiation to final completion of construction. The <br />schedule should include a listing of key tasks within each phase, key milestones and <br />approximate dates, and deliverables. <br />6. Statement Explaining Whv Your Firm Should be Selected to Perform Services for This <br />Protect . <br />Several firms have been asked to respond to this Request for Proposals (RFP). Explain <br />why your firm is the best fit for this project. <br />7. Additional Information <br />Include any other information that is believed to be pertinent, but not specifically <br />requested elsewhere in this RFP. <br />8. Total Consultant Cost <br />Include the estimated hours, per hour charge for each team member, and a not to exceed <br />cost for the project. Include all reimbursable costs in your proposed fee. The City <br />Engineer may have capacity to perform a number of administrative functions on this <br />project including but not limited to assistance with assessment role, conducting the <br />C:\Users\jmiller\AppData\Local\Microsoft\Windows\Temporary Internet <br />Ffles\Low\Content.IES\8YEIN5ER\2011 %20RFP%20Engineering[1].doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.