2. CAIDI (customer average interruption duration index) <br />This is defined as the average length of an interruption weighted by the number of customers affected. <br />It is calculated by summing the customer minutes off during each interruption in the time period and <br />dividing [his by the number of customers experiencing one or more sustained interruptions during the <br />time period. The resulting unit is minutes. The index enables utilities to report the average duration <br />of a customer outage for those customers affected. <br />ERMU's 2010 CAIDI is 94 minutes. Last yeaz's CAIDI was 137 minutes. <br />3. SAIDI (system average interruption duration index) <br />This is defined as the average interruption duration for customers served during a specified time <br />period. It is determined by summing the customer minutes off for each interruption during a specified <br />time period and dividing that sum by [he average number of customers served during that period. The <br />unit is minutes. This index enables the utility to report how many minutes customers would have <br />been out of service if all customers were out at one time. <br />ERMU's 2010 SAIDI is 80.0 minutes. Last year's SAIDI was 5.1 minutes. <br />4. SAIFI (system average interruption frequency index) <br />This is defined as the average number of timers that a customer is interrupted during a specified time <br />period. I[ is determined by dividing the total number of customers interrupted in a time period by the <br />average number of customers served. The resulting unit is "interruptions per customer." <br />ERMU's 2010 SAIFI is 0.853. Last year's SAIFI was 0.037. <br />Another statistic staff gets concerned about is the average length of any outage. Elk River Municipal <br />Utilities' 2010 average length of outage is 108.11 minutes. Last year the average length of outage was <br />109.3 minutes. Electric utilities with a high percentage of underground facilities will exhibit higher <br />length of outage time than electric utilities with more overhead facilities. <br />ACTION REQUESTED: <br />No action is required. <br />