Laserfiche WebLink
3. 292's Project Process 29Z <br />oesgn c~uup <br />5. Preliminary Cost Estimate <br />Once the conceptual designs are prepared, 292 will work with an experienced <br />and qualified construction cost estimator to provide preliminary budgets for each <br />of the options that were developed. Acost-benefit analysis can be generated and <br />recommendations made for a preferred option.The estimates may be used to reliably <br />establish a budget for constructing and furnishing the project. <br />6. Final Report <br />The Conceptual Design Study process will conclude with the preparation of a final <br />report. 292 will assemble all data and othercritical information into a comprehensive, <br />user-friendly document. This report will document the study process and serve as <br />an outline to help guide the ice rink planning, design, and construction, as well as <br />help define the economic parameters of the project. In addition to printed copies of <br />the study, 292 will provide an electronic version (PDF) that can be incorporated into <br />websites, e-newsletters, or other multimedia presentation to promote the projects <br />benefits to the community and to project's stakeholders. <br />7. Presentation of the Completed Feasibilty Study <br />The 292 team will present the completed Feasibility Study to the City of Elk River <br />and to other community stakeholders that are interested in the completed study. <br />N <br />_? <br />9 <br />O <br />N <br />LL <br />0 <br />C <br />N <br />Q <br />U <br />N <br />C <br />Y <br />W <br />7 <br />