My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.8. SR 07-14-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
07/14/1997 - SPECIAL
>
4.8. SR 07-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:53 AM
Creation date
8/6/2003 6:31:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> <br />iver <br /> <br />MEMORANDUM <br /> <br />Item #4.8. <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Mayor & City Council <br /> <br />Phil Hals, Street/Park Supt. <br /> <br />July 10, 1997 <br /> <br />Cass Fields <br /> <br />The grading on the fields has been completed and the topsoil has been placed. <br />The irrigation is nearly completed which means that we are ready for water <br />and electricity. <br /> <br />I requested three quotes for an eight inch irrigation well and to date have <br />received the following two quotes: <br /> <br />· E.H. Renner- $19,684.65 <br />· Bergerson Caswell- $20,720.65. <br /> <br />Anoka Electric Cooperative's charges for the electrical installation are <br />$4,120. <br /> <br />I would request that the City Council approve the E. H. Renner well quote <br />and the electrical hook-up charges from Anoka Electric Cooperative. <br /> <br />At a later date, we will be requesting approval for a 4 inch well for the <br />domestic water supply. <br /> <br />Soon the Round Up will be applied, the seed bed prepared and seeded. The <br />aglime and fencing are scheduled for this fall. Though not much is visible on <br />the surface, the work is progressing nicely. <br /> <br />The above figures are higher than the original estimate, but the total project <br />should still be within the construction budget of $200,000. <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.