Laserfiche WebLink
"-'ity of <br /> <br />'ver <br /> <br />Item #4.7. <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />Mayor & City Council <br /> <br />Pat Klaers, City a~?trator <br />July 14, 1097 <br /> <br />SUBJECT: Highland Road Project Update <br /> <br />The Highland Road watermain construction project is moving forward on <br />schedule. (Councilmember Farber can attest to the construction activity in <br />his neighborhood.) During the Council CIP worksessions, discussion of the <br />vertical curve in Highland Road near Jackson Road took place. It was <br />estimated that about I foot of material would be removed which would lower <br />the vertical curve and that the cost for this work would be about $22,000. <br />The Council requested additional information about the horizontal curve and <br />whether or not the road could slightly shift to the north. <br /> <br />In brief, it does not appear that much can be done regarding the horizontal <br />curve. Additionally, there is a concern that we won't get much in terms of <br />results with a one foot decrease in the vertical curve for the $22,000 <br />investment. City Engineer Terry Maurer will have some pictures and <br />information to present to the Council at this 7/14/97 meeting. <br /> <br />\\elkriverksys\shrdoc\offsite\street\highrdup.doc <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />