My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 07-14-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
07/14/1997 - SPECIAL
>
4.3. SR 07-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:53 AM
Creation date
8/6/2003 6:26:10 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Oompany <br />GONSULTING ENGINEER8 <br /> <br />June 13, 1997 <br />File: 230-306-20 <br /> <br />I'0~11,I'1,~1; <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: <br /> <br />TRUNK HIGHWAY 169/197TH AVENUE SIGNALIZATION <br />CONSTRUCTION BIDS <br /> <br />Dear Council Members: <br /> <br />We have tabulated the bids that were received on Thursday, June 12, 1997, for the signalization <br />of the TH 169/197th Avenue intersection. There were a total of five bidders. The following list <br />provides the bidders and their total bids. <br /> <br />Electric Service company <br />Design Electric, Inc. <br />Electric Installation <br />Kilmore Electric <br />Collisys, Inc. <br /> <br />$157,846.30 <br /> 166,775.00 <br /> 172,107.69 <br /> 181,466.79 <br /> 185,086.75 <br /> <br />As we have discussed previously, the bid included four items. First was the signal system, second <br />an emergency vehicle preemption system, third was an interconnect between the new signal at <br />197th Avenue and the next signal to the south at Jackson/193rd Avenue, and the last thing that <br />was included in this bid were sign panels and a crosswalk. The engineer's estimate was $195,000. <br />The Iow bidder is approximately 23% under this estimate. <br /> <br />Since the bid was just received last Thursday and this is a Contractor we have not worked directly <br />with in the past, we have not had time prior to Monday evening's meeting to check references. <br />However, at the time that the City Council authorized advertisement for bids on this project, there <br />was some discussion whether or not the project should be built at this time. We would like to have <br />some direction as to whether or not the Council wishes to award this bid. If the Council does want <br />to award the bid, we would do reference checks and come back at a later meeting with a resolution <br />for the City Council's consideration. <br /> <br />1326 Energy Park Drive · St. Paul MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.