My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.1. PRSR 02-11-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2004
>
02-11-2004
>
9.C.1. PRSR 02-11-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2011 9:16:39 AM
Creation date
2/4/2011 9:16:37 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
2/11/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~1~rt Gi/christ <br />G/S Specia/ist <br />^ Education <br />University of Minnesota Graduate <br />program in Neuroscience <br />Macalester College Bachelor of Arts, <br />Biology- 1990 <br />Minneapolis Drafting School <br />Currently enrolled in the University of <br />St. Thomas" Masters of Software <br />Design and Development program <br />As a member of Bonestroo's GIS team, Hart is a project manager responsible for <br />all aspects of maintaining a GIS, including: <br />System administration <br />Database management <br />GIS consulting <br />Marketing efforts <br />Application Development & <br />Software Programming <br />Hart is responsible for producing custom applications AutoCAD, ArcView and <br />ArUlnfo drawings and databases, including city and township base maps, <br />wetland mitigation maps, and storm and sanitary sewer plans. <br />^ Project F~cperience <br />NRI, Roseville, MN -Hart was responsible for preparing the base map <br />information, including aerial photos and parcels. After setting up the <br />software and electronic data, he served as a troubleshooter and resource for <br />the Water Resources Group. <br />South Washington Watershed District ~SWWD~ -Hart produced a <br />summary map for the SWWD using a mixture of AutoCAD and ArcView <br />programs. Combining data from many different sources, this map included <br />DNR classified wetlands, wetlands classified by the SWWD, city base maps, <br />water management facilities and sub-watershed delineations. <br />Elm Creek Interceptor, Medina Leg -Coordinated data acquisition and <br />mapping efforts for initial alignment alternatives. Created parcel databases <br />and maps of potentially impacted parcels along alignments. Created <br />electronic 100-year floot datasets from archived hardcopy maps. All work <br />was used to determine final interceptor alignment. <br />City of Waseca -Converted low quality electronic basemap into fully <br />attributed parcel database in the county coordinate system. The new dataset <br />has parcel addresses as well as park and building names. The basemap now <br />seamlessly overlays the aerial photos recently flown by the City. <br />Metropolitan Council South Washington County Interceptor -Hart was <br />responsible for gathering, converting, and generating much of the <br />geographical data used to help determine a proposed alignment for the <br />future interceptor pipeline. Aerial photos ~DOO's~, digital elevation models <br />~DEM"s~, geological, county, and private data were all acquired, converted [o <br />the appropriate coordinate systems, and used to produce geographical data. <br />DEM data was used to create surface contours, which in conjunction with <br />bedrock geological data, were used to create surface vs. bedrock profiles of <br />each proposed interceptor alignment. Project engineers used this data to <br />determine the most cost-effective and leas[ disruptive interceptor alignments. <br />Sherburne County, MN -Hart served as Bonestrao's point man on <br />Sherburne County's Livonia Township mapping project. He helped collect <br />data from the County, including electronic data files, plat maps, tax-roll <br />information, and copies of legal descriptions. Hart also coordinated <br />Bonestroo's CAD team in producing a seamless dataset of approximately <br />1,800 parcels in 29 sections of Livonia Township from the County's dataset. <br />Hart worked with County staff [o identify and research possible discrepancies <br />in existing plats and assisted in error-checking/quality control of the final <br />product. <br />Willmar and Clara City, MN -Hart used Microstation to assist preparing <br />plans and specs for this MnDOT project that overlayed 15.4 miles of TH 23 <br />between these two Minnesota cities. Design was completed <br />in Pali 1999. Construction was completed in fall 2000 at a ~ eonestroo <br />cost of 53.4 million. 0 Rosene <br />Anderlik & <br />Associates <br />Engineered Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.